top of page

Towers Works Progress On Site Didsbury, Manchester

The masterplan works for the towers Business Park for which Leach Rhodes Walker are principal designers for are progressing well on site.

The front entrance works are well underway and the new illuminated entrance signs are due for installation early Jan 2014. Further works on the site are also progressing including three new building refurbishments and site wide signage installation. Watch this space for first stage completion in the New Year.

Featured Posts
Recent Posts
Archive
Follow Us
Search By Tags
  • Facebook Basic Square
  • Twitter Basic Square

Manchester:

Ground Floor West

50 Dearmans Place
Manchester

M3 5LH
Tel: +44 (0)161 833 0211

London:

2 Underwood Row

Hoxton

London

N1 7LQ
Tel: +44 (0)207 993 1363

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
Follow LRW on Twitter
Follow LRW on LinkedIn
LRW Facebook

Leach Rhodes Walker LTD Copyright 2018 | Registered in England (6548787) | All Rights Reserved

bottom of page